Which one of the following is the correct order in which a software project manager estimates various project parameters while using Cocomo?

Software Engineering - COCOMO Model, Flow Process, Matrices, Complexity MCQ

Software Engineering - COCOMO Model in software Engineering || Flow process || Related MCQs Questions || For GATE, UGC NET, PSU EXAMS, ISRO, BARC, DSSSB TGT, CET PGT, DMRC METRO, UPTET TGT PGT, etc

The Subject of Software Engineering of computer science, we can practice Multiple Choice Type Questions (MCQs) based on the COCOMO Model in software engineering, Different types of Project Estimation Technique, such as Organic, Semidetached, Cohesion and coupling, and many more these questions are very useful for government exams, PSU exam and Campus placement exam, RRB JE, Bank SO, Computer Science PGT, TGT, UGC NET and many more under this section have All important questions and also have some questions which already asked in different Government Examinations.

Q1.

What is a measure of the relative functional strength of a module?


[ VVIQ]

(A).Cohesion
(B).Coupling
(C).Process
(D).User interface

Q2.

In a software project,COCOMO is used to estimate


[ VVIQ]

(A).Effort and duration on the size of the software
(B).Size and duration based on the effort of the software
(C).Effort and cost based on the duration of the software
(D).Size, effort and duration based on the cost of the software

Q3.

.................. is a measure of the relative interdependence among modules?


[ VVIQ]

(A).Cohesion
(B).Coupling
(C).User interface
(D).Process

Q4.

Which term would be appropriate if functions contained in a module are executed in the same time span?


[ VVIQ]

(A).Procedural cohesion
(B).Temporal cohesion
(C).Temporal coupling
(D).Functional cohesion

Q5.

What is the correct order in which a software project manager estimates various project parameters while using COCOMO?


[ VVIQ]

(A).Size,effort,duration,cost
(B).Effort,duration,cost,size
(C).Size,duration,cost,effort
(D).Size,cost,duration,effort

Q6.

What is a measure of the relative functional strength of a module?


[ VVIQ]

(A).Cohesion
(B).Coupling
(C).User interface
(D).Process

Q7.

In which cohesion different functions of the module co-operate to complete a single task?


[ VVIQ]

(A).Temporal
(B).Functional
(C).Procedural
(D).Sequential

Q8.

What is the formula for effort calculation by COCOMO for an organic project? 


[ MAKAUT 2012]

(A).3.0*(KLOC)^1.12
(B).2.4*(KLOC)^1.05
(C).3.6*(KLOC)^1.20
(D).3.0*(KLOC)^2.5

Q9.

The full form of the software cost estimation model, COCOMO is  :


[ RRB JE IT 2015]

(A).Common cost model
(B).Conversing cost model
(C).Cost constructive model
(D).Constructive cost model

Q10.

COCOMO stands for :


[ Technical Assistant ISRO/VSSC 2018]

(A).The consumer cost model
(B).The cost constructive model
(C).The consumer constructive model
(D).The constructive cost model

Q11.

The degree of infra-dependability within the elements of a software module is called


[ Technical Assistant ISRO/VSSC 2018]

(A).Coupling
(B).Concurrency
(C).Cohesion
(D).Modularisation

Q12.

In the context of modular software design, which one of the following combinations is desirable?


[ Technical Assistant ISRO/VSSC 2018]

(A).High cohesion and high coupling
(B).High cohesion and low coupling
(C).Low cohesion and high coupling
(D).Low cohesion and low coupling

Q13.

Which of the following is not a part of UML?


[ Technical Assistant ISRO/VSSC 2019]

(A).Entity relationship diagram
(B).Usecase diagram
(C).Class diagram
(D).Sequence diagram

Q14.

Which option is most preferable?


[ MAKAUT 2012]

(A).High coupling ,Low cohesion
(B).High cohesion, Low coupling
(C).High cohesion and coupling
(D).None of these

Q15.

A data dictionary was created during the requirement analysis phase of a software engineering project what information does it contain?


[ MAKAUT 2011]

(A).Interface
(B).Data type
(C).Context description
(D).All of the above

Q16.

To allocate resources to activities we use


[ MAKAUT 2010]

(A).PERT Chart
(B).Network diagram
(C).Gantt Chart
(D).All of the these



Which one of the following is the correct order in which a software project manager estimated various project parameters while using Cocomo?

Therefore, the order is size, effort, duration, cost.

Which of the following estimating method is most appropriate when detailed information about the project is lacking?

Expert judgment - It's most useful when you're planning a standard project that is similar to ones your team has completed before. Expert judgment can be used for creating top-down or bottom-up estimates.

Which Cocomo estimation model is used to evaluate the effort to system requirements and design options?

Boehm proposed COCOMO (Constructive Cost Estimation Model) in 1981. COCOMO is one of the most generally used software estimation models in the world. COCOMO predicts the efforts and schedule of a software product based on the size of the software.

What are the software development modes in Cocomo give formula for effort schedule estimation in basic Cocomo?

Basic COCOMO Model It requires to calculate the efforts which are required to develop in three modes of development that are organic mode, semi-detached mode, and embedded mode. Where, E is effort applied in person-months. D is development time in months.